| For 2008 |
|
I08-I-1 |
Revision of Accident Investigation Procedures |
|
I08-III-1 |
Part 100 Safety and Health Conferences |
|
I08-III-2 |
Procedures for Evaluating Flagrant Violations |
|
I08-IV-1 |
Procedures for Documenting Inspections of Impoundments on Regular (E01) Inspections |
|
I08-V-1 |
Revision of Uniform Mine File Procedures Handbook |
|
I08-V-2 |
Technical Support Assistance in Reviewing Roof Control Plans |
|
I08-V-3 |
Procedures for Evaluation of Requests to Make Extended Cuts with Remote Controlled Continuous Mining Machines |
|
I08-V-4 |
Installation of Permanent Stoppings on Working Sections |
|
I08-V-05 |
Responsibility for Approval of Blasting and Underground Coal Mine Waste Disposal Plans |
|
I08-V-06 |
Weekend E01 Inspections |
|
I08-V-07 |
Roof Bolt Spacing |
|
I08-V-08 |
Procedures for Inspection of Seals |
| For 2007 |
|
I07-V-02 |
Fall Protection during Concrete Storage Silo Construction |
|
I07-V-03 |
Mine Safety Appliances Life-Saver 60 Self-Contained Self-Rescuer |
| For 2006 |
|
I06-V-01 |
Procedures for Implementing the Mine Plan Approval Database System |
|
I06-V-02 |
Annual Review of Approved SCSR Storage Plans, Annual Survey of
Self-Rescue Devices and Investigating and Reporting Problems with Self-Rescue Devices |
|
I06-V-05 |
Installation of Permanent Stoppings on Working Sections |
|
I06-V-06 |
Procedures for Evaluation of Requests to Make Extended Cuts With Remote Controlled Continuous Mining Machines |
|
I06-V-07 |
Supplemental Roof Support Materials |
|
I06-V-08 |
Tensioned Cable Bolts |
|
I06-V-11 |
Mine Safety and Health Administration (MSHA) Procedures for
Properly Identifying Equipment in Official Agency Document
|
| For 2005 |
|
I05-V-03 |
Diesel-Powered Equipment Inventory for Underground Coal Mines |
|
I05-V-05 |
Evaluation of Non-Permissible, Heavy-Duty, Diesel-Powered Equipment, Compressors and Generators for Use of an Adequate Diesel Particulate Matter (DPM) Aftertreatment Device (PDF only) |